BEGIN:VCALENDAR
PRODID:-//Microsoft Corporation//Outlook 14.0 MIMEDIR//EN
VERSION:2.0
METHOD:PUBLISH
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VTIMEZONE
TZID:GMT Standard Time
BEGIN:STANDARD
DTSTART:16011028T020000
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=10
TZOFFSETFROM:+0100
TZOFFSETTO:-0000
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:16010325T010000
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=3
TZOFFSETFROM:-0000
TZOFFSETTO:+0100
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
CLASS:PUBLIC
CREATED:20120111T094859Z
DESCRIPTION:Updated: 11/01/2012\n\nPlease note this meeting is  a week earl
	y due to the Olympic shutdown.\n\nLondon Tideway Tunnels\nA presentation p
	roviding an update on the current status on the Lee Tunnel (under construc
	tion) and Thames Tunnel (in design)\, on Thames Water's mega-sewer project
	 in London.\n\nSpeaker\nPeter Jewell – Engineering Manager\, Lee Tunnel 
	Bob Hayden – Project Manager Lee Tunnel		\n*	Tea and biscuits will be av
	ailable at 5.30 PM\n*	Meetings will be held at the ICE unless otherwise st
	ated\n*	Meetings will start at 6.00 PM & finish at 7.30 PM unless otherwis
	e stated\n*	A licensed bar will be open after the meeting at the ICE\n*	A 
	variety of foods will be served in the ICE Brasserie after each meeting.\n
	*	Advance booking not required.\n\n
DTEND;TZID="GMT Standard Time":20120614T193000
DTSTAMP:20120111T094859Z
DTSTART;TZID="GMT Standard Time":20120614T180000
LAST-MODIFIED:20120111T094859Z
LOCATION:Meetings will be held at the ICE unless otherwise stated
PRIORITY:5
SEQUENCE:0
SUMMARY;LANGUAGE=en-gb:BTS Monthly Meeting - London Tideway Tunnels
TRANSP:OPAQUE
UID:040000008200E00074C5B7101A82E008000000001019B74545D0CC01000000000000000
	010000000194C30EF2B0212418A69A085B861CAC3
X-ALT-DESC;FMTTYPE=text/html:<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//E
	N">\n<HTML>\n<HEAD>\n<META NAME="Generator" CONTENT="MS Exchange Server ve
	rsion 08.01.0240.003">\n<TITLE></TITLE>\n</HEAD>\n<BODY>\n<!-- Converted f
	rom text/rtf format -->\n\n<P DIR=LTR><SPAN LANG="en-gb"><FONT FACE="Calib
	ri">Updated: 11/01/2012</FONT></SPAN><SPAN LANG="en-gb"></SPAN></P>\n\n<P 
	DIR=LTR><SPAN LANG="en-gb"><FONT FACE="Calibri">Please note this meeting i
	s&nbsp\; a week early due to the Olympic shutdown.</FONT></SPAN><SPAN LANG
	="en-gb"></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"><B><FONT FACE="Calib
	ri">London Tideway Tunnels</FONT></B></SPAN><SPAN LANG="en-gb"><BR>\n<FONT
	 FACE="Calibri">A presentation providing an update on the current status o
	n the Lee Tunnel (under construction) and Thames Tunnel (in design)\, on T
	hames Water's mega-sewer project in London</FONT></SPAN><SPAN LANG="en-gb"
	><FONT FACE="Calibri">.</FONT></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"
	></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"><B><FONT FACE="Calibri">Spea
	ker</FONT></B></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"><FONT FACE="Cal
	ibri">Peter Jewell – Engineering Manager\, Lee Tunnel Bob Hayden – Pro
	ject Manager Lee Tunnel&nbsp\; &nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&
	nbsp\;</FONT></SPAN><SPAN LANG="en-gb"><BR>\n</SPAN><SPAN LANG="en-gb"></S
	PAN><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol
	">&#183\;<FONT FACE="Courier New">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp
	\;</FONT></FONT></SPAN><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"> <FONT
	 FACE="Calibri">Tea and biscuits will be available at 5.30 PM</FONT></SPAN
	></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"></SPAN><S
	PAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol">&#183\;<FONT FACE="Courier New
	">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;</FONT></FONT></SPAN><SPAN LAN
	G="en-gb"> <FONT FACE="Calibri">Meetings will be held at the ICE unless ot
	herwise stated</FONT></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPAN><
	SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol">&#1
	83\;<FONT FACE="Courier New">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;</F
	ONT></FONT></SPAN><SPAN LANG="en-gb"> <FONT FACE="Calibri">Meetings will s
	tart at 6.00 PM &amp\; finish at 7.30 PM unless otherwise stated</FONT></S
	PAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"></SPAN
	><SPAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol">&#183\;<FONT FACE="Courier 
	New">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;</FONT></FONT></SPAN><SPAN 
	LANG="en-gb"> <FONT FACE="Calibri">A licensed bar will be open after the m
	eeting at the ICE</FONT></SPAN></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPA
	N><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol">
	&#183\;<FONT FACE="Courier New">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;
	</FONT></FONT></SPAN><SPAN LANG="en-gb"> <FONT FACE="Calibri">A variety of
	 foods will be served in the ICE Brasserie after each meeting.</FONT></SPA
	N></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"></SPAN><
	SPAN LANG="en-gb"><FONT SIZE=2 FACE="Symbol">&#183\;<FONT FACE="Courier Ne
	w">&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;&nbsp\;</FONT></FONT></SPAN><SPAN LA
	NG="en-gb"> <FONT FACE="Calibri">Advance booking not required.</FONT></SPA
	N></P>\n\n<P DIR=LTR><SPAN LANG="en-gb"></SPAN><SPAN LANG="en-gb"></SPAN><
	/P>\n\n</BODY>\n</HTML>
X-MICROSOFT-CDO-BUSYSTATUS:BUSY
X-MICROSOFT-CDO-IMPORTANCE:1
X-MICROSOFT-DISALLOW-COUNTER:FALSE
X-MS-OLK-AUTOFILLLOCATION:FALSE
X-MS-OLK-CONFTYPE:0
BEGIN:VALARM
TRIGGER:-PT15M
ACTION:DISPLAY
DESCRIPTION:Reminder
END:VALARM
END:VEVENT
END:VCALENDAR

